Eniram signs MoU to develop new generation of bulk carriers
(Posted on 24/05/18)
Eniram, a Wärtsilä company, has signed a Memorandum of Understanding with Athens-based Arista Shipping to participate in the Project Forward initiative, which is led by Arista. The project has developed a dry bulk carrier vessel that features an unprecedented high level of energy efficiency. The carrier’s design is based on LNG-fuelled propulsion. Eniram’s contribution will be to assist in the development of monitoring and optimisation tools.
The selection of Eniram to participate was based on its strong track record and in-house competences in the utilisation of ship data and modelling to provide accurate recommendations for improving efficiency. The vessel design will enable compliance with all known, applicable, and anticipated regulations proposed by the International Maritime Organization (IMO). These include the Energy Efficiency Design Index 2025, SOx post 2020, and NOx Tier III without any after treatment.
“We are delighted to be a part of this exciting project, which will create a vessel with the levels of performance and sustainability needed as the marine industry enters a new era. Our input will help ensure that operational visibility will be maximised, and that the new ships can operate at optimal efficiency,” said Giannis Moraitakis, E&A Business & Sales Development Manager, Wärtsilä Marine Solutions.
“Project Forward represents a milestone for the shipping industry, since it brings a substantial discontinuity to traditional ship design and performance. The project establishes LNG as a global marine fuel, and we welcome Eniram’s involvement. They have proven expertise in energy management technology, and this know-how will be of great importance. The aim of the project is to arrive at a fully elaborated decision support tool, which will be extremely valuable in enabling us to predict, monitor, optimise, and also demonstrate the actual performance of the vessels,” said Antonis Trakakis, Technical Manager, Arista Shipping.
Wärtsilä is also a part of the project team because of its experience and leading technologies in LNG propulsion. The propulsion design concept is to be based on a novel arrangement featuring just two highly efficient Wärtsilä 31DF dual-fuel engines without additional gensets. Other parties involved include Finnish ship designer Deltamarin, the Houston-based classification society American Bureau of Shipping (ABS), and GTT, the French LNG membrane containment system designer.
Arista Shipping has signed a Letter of Intent with Yangzijiang Shipbuilding (YZJ) to build a series of up to 20 bulk carriers to the new design.
Latest News
U-Ming Marine appoints Anemoi to install Rotor Sails on VLOC
(Posted on 29/11/24)Leading wind-propulsion technology provider Anemoi Marine Technologies Ltd. (“Anemoi”) and... Read more
Liberia Receives IMSAS Audit
(Posted on 29/11/24)The Liberian Registry, the world’s largest flag registry is undergoing the International Maritime... Read more
NorthStandard and NNPC enter into strategic partnership
(Posted on 29/11/24)NorthStandard has announced a new and expanded strategic partnership with Noord Nederlandsche P&... Read more
Maritime appetite for cyber risk higher than other industries
(Posted on 20/11/24)A new report published by DNV reveals that the majority (61%) of maritime professionals believe the... Read more
NorthStandard adjusts for future with precautionary premiums increase
(Posted on 20/11/24)The return of higher claim volumes during 2024, increased exposure to larger claims, and continuing... Read more
ClassNK ELW on improving seafarers’ living conditions for Tokei Kaiun bulker
(Posted on 12/11/24)ClassNK has granted its ‘ELW (HP)’ (Excellent Living and Working Environment (Hydroponics... Read more
FONASBA elects new President and Board
(Posted on 12/11/24)The Federation of National Associations of Ship Brokers and Agents (FONASBA) has held its annual meeting... Read more
10,000 cadets benefit from Sailors’ Society virtual conferences
(Posted on 12/11/24)Record-breaking numbers of cadets and ratings from across the globe have attended the 2024 Sailors&rsquo... Read more
Algoma’s stronger quarter signals promising close to the year
(Posted on 04/11/24)Algoma Central Corporation has reported its results for the three and nine months ended September 30... Read more
Urgent need for updated medical guide for ships
(Posted on 04/11/24)Marine Medical Solutions, a key player in maritime healthcare, is raising awareness to the urgent need... Read more